Logo
Đăng ký ấn phẩm|Đăng nhập

Vietnam to allocate nearly US$2 billion for Mekong Delta development

The Mekong Delta region is facing bottlenecks in development, especially in transportation, while there have been greater risks in climate change that require immediate measures.

The Vietnamese government is scheduled to allocate VND45 trillion (nearly US$2 billion) in the next five years to boost economic development in the Mekong Delta region, according to Nguyen Chi Dung, minister of Planning and Investment. 
 
Overview of the conference. Source: VGP.
Overview of the conference. Source: VGP.
The Mekong Delta region is facing bottlenecks, including the lack of adequate infrastructure in development, especially in transportation, while there have been greater risks in climate change that require immediate response, Dung said at a conference discussing the sustainable development of the Mekong Delta on June 18. 

On this issue, Prime Minister Nguyen Xuan Phuc requested related government agencies and provinces to review the mechanism for capital mobilization and facilitating a financial market for Mekong Delta region. 

According to Phuc, the region has its unique financial mechanism through mobilizing funds from foreign investors, official development assistance (ODA) and the private sector. 

Such joint efforts would ensure an investment capital influx of US$2 billion in the 2016 – 2020 period for the Mekong Delta region to speed up large scale projects in the fields of infrastructure development and tackling climate change issues, Phuc added. 

Phuc considered the region a vital part for the country’s economic development, saying investing for Mekong Delta is for the benefit of the overall economy. Similarly, Ho Chi Minh City investment's in the Mekong Delta would bring equal return for the city, he stated. 

Currently, the Mekong Delta has a population of 20 million, and contributes 20% to the country's GDP. If the Southeastern region is taken into account, the region would make up over 60% of Vietnam’s GDP. 

Without the Mekong Delta region, Ho Chi Minh City could not maintain its current economic scale, which currently accounts for 30% of the country’s GDP. 
 
Prime Minister Nguyen Xuan Phuc addressed the event. Source: VGP.
Prime Minister Nguyen Xuan Phuc addressed the event. Source: VGP.
Under this context, Phuc requested Ho Chi Minh City to be in charge of drafting up a working mechanism forming greater linkage between cities and provinces in the region. 

Meanwhile, Phuc acknowledged climate change is putting greater risks on the livelihoods of people in Vietnam and also in Southeast Asia. 

A recent report by HSBC suggested Vietnam is one of the 10 countries that are most vulnerable to climate change. 

Minister of Transport Nguyen Van The said transport infrastructure projects with sufficient funds are expected to be completed in the near future, especially expressways projects connecting Ho Chi Minh City with provinces and cities in Mekong Delta and upgrading national highways. 

The inland waterway and logistics projects in southern region financed by the World Bank is scheduled to start construction in 2020 and completed by 2025, The informed. 

The transport minister said his ministry would consider upgrading the capacity of the Phu Quoc International Airport and encourage airlines to open new flight routes connecting Can Tho Airport with other provinces. 

According to the Ministry of Planning and Investment, public investment fund (10% of contingency excluded) for the Mekong Delta region in the 2016 – 2020 period is nearly VND194 trillion (US$8.3 billion), accounting for 16.53% of the total. 

The fund would be mainly focused on agriculture, transportation and healthcare development. 
Đọc nhiều
HỎI ĐÁP THÔNG MINH

BÌNH LUẬN (0)

Đừng bỏ lỡ
Foreign firms keen to invest in wide range of sectors in Hanoi: Diplomats

Foreign firms keen to invest in wide range of sectors in Hanoi: Diplomats

23/11/2019 | 00:44

On the occasion of the 65th anniversary of Hanoi’s Liberation and the Vietnam Entrepreneur Day, foreign diplomats recognized the capital city’s efforts to make its investment climate more conducive, and pointed out the sectors in this city that companies from their countries are interested to get engaged in.

Tin mới
Gỡ vướng để hoàn thành khoảng 1.000km đường cao tốc trong năm 2025

Gỡ vướng để hoàn thành khoảng 1.000km đường cao tốc trong năm 2025

29/01/2025 | 21:42

Kinhtedothi- Theo Bộ GTVT, các dự án quan trọng quốc gia, trọng điểm ngành GTVT trong năm 2024 dù gặp nhiều khó khăn nhưng vẫn bảo đảm tiến độ, chất lượng. Đến nay, cả nước đã đưa vào khai thác 2.021km đường cao tốc. Để hoàn thành mục tiêu 3.000km cao tốc trong năm 2025, cần hoàn thành thêm khoảng 1.000km.

Đường sắt đô thị: xương sống “xanh” của giao thông đô thị

Đường sắt đô thị: xương sống “xanh” của giao thông đô thị

28/01/2025 | 10:56

Kinhtedothi - Đường sắt đô thị (ĐSĐT) được ví như xương sống của hệ thống giao thông công cộng bởi năng lực vận chuyển ưu việt. Hơn nữa, ĐSĐT còn là phương tiện chủ đạo để những đô thị lớn như Hà Nội kiến tạo một hệ thống giao thông xanh, bến vững.

Hà Nội: tăng cường xử phạt vi phạm trông giữ xe

Hà Nội: tăng cường xử phạt vi phạm trông giữ xe

28/01/2025 | 10:51

Kinhtedothi - Thanh tra Sở GTVT Hà Nội cho biết, năm 2024 đã xử phạt hơn 748 trường hợp vi phạm trông giữ xe, phạt tiền hơn 3,4 tỷ đồng. Năm 2025, đơn vị sẽ tiếp tục phối hợp với lực lượng liên ngành cùng địa phương tăng cường kiểm tra các điểm trông giữ xe trên địa bàn TP.

“Tết vội” trên công trường trọng điểm của Thủ đô Hà Nội

“Tết vội” trên công trường trọng điểm của Thủ đô Hà Nội

27/01/2025 | 08:34

Kinhtedothi - Những ngày sát Tết Nguyên đán Ất Tỵ, trên công trường khoan hầm tuyến đường sắt đô thị Nhổn - Ga Hà Nội vẫn nhộn nhịp công nhân, kỹ sư cùng máy móc ầm ì hoạt động. Để bảo đảm “đường găng” tiến độ, công trường sẽ nghỉ Tết muộn và quay trở lại làm việc từ sớm.

Tin tài trợ