Logo
Đăng ký ấn phẩm|Đăng nhập

World Bank, UN work with Vietnam to speed up disbursement of ODA

World Bank Country Director for Vietnam Ousmane Dione claimed about delayed signing and receiving non-refundable loans, including disaster relief.

Representatives of the World Bank and the United Nations have worked with the government of Vietnam to call for advancing the disbursement of official development assistance (ODA) in the Southeast Asian country. 
 
Vietnamese Deputy PM and Foreign Affairs Minister Pham Binh Minh at the meeting with the World Bank Country Director for Vietnam Ousmane Dione, the UN Resident Coordinator in Vietnam Kamal Malhotra
Vietnamese Deputy PM and Foreign Affairs Minister Pham Binh Minh at the meeting with World Bank Country Director for Vietnam Ousmane Dione, UN Resident Coordinator in Vietnam Kamal Malhotra. Photo: VGP
The World Bank Country Director for Vietnam Ousmane Dione, the UN Resident Coordinator in Vietnam Kamal Malhotra, and Dutch Ambassador to Vietnam Elsbeth Akkerman on July 10 worked with Vietnamese Deputy Prime Minister and Minister of Foreign Affairs Pham Binh Minh on the issue. 
 
The issue discussed was the slow disbursement of ODA over the past time. Ousmane Dione emphasized the delay of signing and receiving non-refundable loans, including disaster relief. 
 
He noted some exceptional cases including those which waited for almost three years to start disbursement.
 
Vietnam’s active moves 
 
In turn, Deputy PM Minh pledged to ask related agencies to check the situation and affirm no recurrence. 
 
Minh proposed tightened cooperation in tackling procedures on process (for donors) and on plan basis (for the recipient) to curb Vietnam’s public debt. 
 
At the meeting, Minh thanked the donors for their continuous support for the development of Vietnam and hoped for diversified financial sources which match with the Vietnamese government’s priorities. 
 
In details, Minh said the government has issued a series of regulations which aim to improve efficiency of foreign-sourced capital. The documents include a decree on re-lending to local governments, the prime minister’s decision on drawing and using ODA and preferential loans for the 2018-2020 period and vision 2021-2025, revised Law on Procurement submitted to the National Assembly (NA) for approval. 
 
He called for further cooperation between the donors and Vietnam in making policies to facilitate the disbursement of ODA.
 
In addition, the Ministry of Planning and Investment has worked with related agencies to review sluggish projects for timely adjustment. 
 
In a related move, Deputy PM Minh has recently participated in a dialogue with representatives of six donors to find proper measures for the quicker disbursement. 
 
UN Resident Coordinator in Vietnam Kamal Malhotra in a speech delivered at the National Conference on Sustainable Development 2018 said Agenda 2030 cannot be attained by governments alone, it requires the active participation of all members of society. Moreover, these goals can only be achieved with sufficient and coordinated financial investment.
 
The World Bank is one of main donors for Vietnam, helping arrange billions of dollars for development projects in the country. Every year since 1993, international donors have attended the Vietnam Development Forum (VDF), formerly known as the Consultative Group (CG) meeting, and more recently Vietnam Development Partnership Forum – a platform for discussions between government and donor agencies on development policies and donor pledges.
 
The first Vietnamese CG meeting was held in Paris in 1993 and since 1999 it has been held in Vietnam, co-chaired by the Ministry of Planning and Investment and the World Bank in Vietnam. 
 
Two meetings are held each year, including an informal meeting in June usually held outside Hanoi in order to combine it with a field visit, and a formal meeting during December held in Hanoi.
Đọc nhiều
HỎI ĐÁP THÔNG MINH

BÌNH LUẬN (0)

Đừng bỏ lỡ
Tin mới
Đường sắt đô thị: xương sống “xanh” của giao thông đô thị

Đường sắt đô thị: xương sống “xanh” của giao thông đô thị

28/01/2025 | 10:56

Kinhtedothi - Đường sắt đô thị (ĐSĐT) được ví như xương sống của hệ thống giao thông công cộng bởi năng lực vận chuyển ưu việt. Hơn nữa, ĐSĐT còn là phương tiện chủ đạo để những đô thị lớn như Hà Nội kiến tạo một hệ thống giao thông xanh, bến vững.

Hà Nội: tăng cường xử phạt vi phạm trông giữ xe

Hà Nội: tăng cường xử phạt vi phạm trông giữ xe

28/01/2025 | 10:51

Kinhtedothi - Thanh tra Sở GTVT Hà Nội cho biết, năm 2024 đã xử phạt hơn 748 trường hợp vi phạm trông giữ xe, phạt tiền hơn 3,4 tỷ đồng. Năm 2025, đơn vị sẽ tiếp tục phối hợp với lực lượng liên ngành cùng địa phương tăng cường kiểm tra các điểm trông giữ xe trên địa bàn TP.

“Tết vội” trên công trường trọng điểm của Thủ đô Hà Nội

“Tết vội” trên công trường trọng điểm của Thủ đô Hà Nội

27/01/2025 | 08:34

Kinhtedothi - Những ngày sát Tết Nguyên đán Ất Tỵ, trên công trường khoan hầm tuyến đường sắt đô thị Nhổn - Ga Hà Nội vẫn nhộn nhịp công nhân, kỹ sư cùng máy móc ầm ì hoạt động. Để bảo đảm “đường găng” tiến độ, công trường sẽ nghỉ Tết muộn và quay trở lại làm việc từ sớm.

Bổ sung quy định mới giúp khắc phục bất cập đầu tư trạm dừng nghỉ

Bổ sung quy định mới giúp khắc phục bất cập đầu tư trạm dừng nghỉ

25/01/2025 | 07:30

Kinhtedothi - Do các quy định ở giai đoạn trước về đầu tư, kinh doanh, khai thác trạm dừng nghỉ chưa đầy đủ, rõ ràng, nên việc triển khai xã hội hóa nguồn lực gặp rất nhiều khó khăn. Từ ngày 1/1/2025, Nghị định 165/2024/NĐ-CP có hiệu lực sẽ giúp khai thông cơ chế, tháo gỡ các bất cập.

Tin tài trợ